A structured route to post-construction CE certification.
PCA inspection and technical-file coordination for vessels requiring assessment after construction.
Compliance support
From vessel inspection to certification documentation.
The assessment scope and applicable requirements are confirmed for the individual vessel before the certification process begins.
ARGO MARITIME coordinates Post Construction Assessment through an experienced EU Notified Body. The process addresses the vessel inspection and the documentation required under the applicable EU framework.
Support includes the survey report, technical file, ISO-related PCA documentation, builder and WIN plates, and coordination of the final CE certificate.
Capabilities
The PCA process
01
Eligibility Review
Confirming the vessel and assessment route.
02
Vessel Inspection
Inspection against Post Construction Assessment requirements.
03
Survey Report
Documenting findings and technical characteristics.
04
Technical File
Compiling the required PCA and ISO documentation.
05
Identification Plates
Preparation of builder and WIN plates.
06
CE Certificate
Coordination with the Notified Body through issuance.
Tell us what your vessel needs. We will coordinate the next step.